Wellsite Reclamation Project 
PB060120
PB060120

PB060121
PB060121

Dozer leveling subsoil
Dozer leveling subsoil

Dozer beginning to level subsoil returned from spoil pile
Dozer beginning to level subsoil returned from spoil pile

Bulldozer replacing top soil containing woody debris
Bulldozer replacing top soil containing woody debris

Ice-built non-stripped pad (note that the site is not perfectly
level)
Ice-built non-stripped pad (note that the site is not perfectly
level)

Cross-section of pad material (wood chips and ice)
Cross-section of pad material (wood chips and ice)

Non-stripped site after snowmelt
Non-stripped site after snowmelt

Ripping of the frozen pad material so it can be spread evenly over the site contours
Ripping of the frozen pad material so it can be spread evenly over the site contours

Powered by Gallery v1 RSS